Availability: | |
---|---|
Quantity: | |
Specification | |
Product name | Modern design steel adult bed military dormitory metal bunk bed iron school student double bunk bed |
Size | H2000*W900*L2000 or per customer's requirement |
Packing volume | 0.205cbm |
Loading capacity | 120pcs/20GP,330pcs/40HQ |
Details | |
Material | High quality SPCC cold rolled steel plate |
Thickness of the plate | Leg:1.2thickness*38/48/50mm pipe |
Color | RAL or Pantone color |
Surface | Acid washed, phosphatzied and electrostatic powder coating finish, friendly environmental |
Structure | Knocked-down/ Assembled |
Capacity | Each layer can load 40kgs-60kgs |
Package | 1. Inner packing: polyfoam and pearl-cotton. |
Certification | ISO 9001, ISO14001, SGS and BV |
OEM&ODM | Customized |
Supply and Trade terms | |
Port | Qingdao/Tianjin |
Payment term | 30% deposit in advance, the balance upon the copy of B/L |
Terms of payment | EXW, FOB, CIF, C&F |
MOQ | Small q'ty for trial order is allowed |
Production capacity | 20000 pcs/month |
Production lead-time | 1-4weeks |
Specification | |
Product name | Modern design steel adult bed military dormitory metal bunk bed iron school student double bunk bed |
Size | H2000*W900*L2000 or per customer's requirement |
Packing volume | 0.205cbm |
Loading capacity | 120pcs/20GP,330pcs/40HQ |
Details | |
Material | High quality SPCC cold rolled steel plate |
Thickness of the plate | Leg:1.2thickness*38/48/50mm pipe |
Color | RAL or Pantone color |
Surface | Acid washed, phosphatzied and electrostatic powder coating finish, friendly environmental |
Structure | Knocked-down/ Assembled |
Capacity | Each layer can load 40kgs-60kgs |
Package | 1. Inner packing: polyfoam and pearl-cotton. |
Certification | ISO 9001, ISO14001, SGS and BV |
OEM&ODM | Customized |
Supply and Trade terms | |
Port | Qingdao/Tianjin |
Payment term | 30% deposit in advance, the balance upon the copy of B/L |
Terms of payment | EXW, FOB, CIF, C&F |
MOQ | Small q'ty for trial order is allowed |
Production capacity | 20000 pcs/month |
Production lead-time | 1-4weeks |